Monday, July 11, 2011

Moved In!

A little over a month ago the homeowners were able move into their new home. Finally! We're running behind on posting pictures but here are a few of the ones that were taken over the last couple months. There are a few finishing touches, concrete, and landscaping to be finished. More pictures will come when those have been completed.

Stairwell
Kitchen

Front Porch

Daylight Basement and Wraparound Porch
Front Timbers
Back Covered Porch & Deck
Covered Porch & Deck

Tongue & Groove Cedar Covered Porch
Wood Floors

Thursday, April 21, 2011

Hardwoods, Carpet & Siding

The inside of the house is pretty much done! Except for some finishing things like grout on the tile and the stairwell carpet and railing. Hardwoods have been sanded and finished and most of the carpet has been laid. Outside, siding is almost complete and then onto the decking.


Living Room
Downstairs Rec Area

Downstairs Bar

Front Entrance

Wednesday, April 6, 2011

Is it Done Yet?

Almost! I know we say that every time. But it really is almost done now. Cedar siding has started going up, painters have started on the outside, the last of the tile is being finished, and cabinets/closets are almost complete.
Daylight Basement Front of House Kitchen Downstairs Bar Master Bedroom Closet

Friday, March 18, 2011

Tile & Rock

More progress pictures....

Granite tile: Kitchen counters
Rock behind downstairs wood stove
Master Bathroom

Pellet Stove

Wednesday, March 16, 2011

It Almost Looks Liveable

Installation of cabinets in the kitchen, bathrooms, and laundry room has started. Wood floors are installed and just need to be sanded and finished. Concrete behind the wood stove and bar area in the basement has been stained (finished pictures will be posted later). And trim is around doors, windows and floors. It's so close to being liveable!

Downstairs Bathroom
Stained Concrete (in progress)

Cabinets in Rec Room

Laundry Room

Master Bath Shower

Hallway off Living Room

Kitchen

Kitchen

Friday, February 25, 2011

Wood Floors & Tile

The wood floors and tile are coming along. The front door was also installed yesterday. Here are a few more progress pictures.

Hallway wood floors

Front door

Kitchen and Living floors

Master Bath tile floor

Monday, February 21, 2011

More Pictures

I've figured out a better setting for indoor pictures that have no lighting. Here's a few more of the beginning of tile and the newly painted rooms. Garage doors are complete and this week wood floors begin.

Tile shower in the Master Bath

Wood flooring ready for installation in the Living Room

Looking towards the stairwell from the Living Room

Kitchen

Master Bedroom

Theater Room downstairs

Rec Room downstairs

Wood Stove and Stairwell

Garage Doors

Wednesday, February 16, 2011

Getting Close

I didn't realize how long it had been since we posted pictures but I finally have a few more of all the things going on with this new home. Sheetrock and painting have been completed, siding is still in progress, cedar tongue and groove has been installed on the deck ceiling, tile has begun, and the day after pictures were taken the garage doors were installed. Hopefully we'll have more pictures in the next week of all the changes. It's getting close!
Kitchen Area
Master Bedroom looking towards Bath and Laundry Room
Downstairs Wood Stove
Top Deck - Siding and T&G
Cedar Tongue & Groove Ceiling
Downstairs Patio Area
Back of House